| View previous topic :: View next topic |
| Author |
Message |
Roy S. Flying Brick Rider

Joined: 05 Mar 2008 Posts: 1349 Location: W. Sacramento, California
|
Posted: Fri Jan 09, 2009 8:27 pm Post subject: Math Question: |
|
|
A Backhoe weighing 8 tons is on top of a flatbed trailer and heading east on Interstate 70 near Hays, Kansas.
The extended shovel arm is made of hardened refined steel and the approaching overpass is made of commercial-grade concrete, reinforced with 1 1/2 inch steel rebar spaced at 6 inch intervals in a criss-cross pattern layered at 1 foot vertical spacing.
Solve: When the shovel arm hits the overpass, how fast do you have to be going to slice the bridge in half?? (Assume no effect for headwind and no braking by the driver...)
Extra Credit: Solve for the time and distance
required for the entire rig to come to a complete stop after hitting the overpass at the speed calculated above?
Yes, you can neglect friction.
*
*
*
I couldn't solve it either......but who cares;
the pictures are wild! _________________ 1993 K1100LT/On going project
1990 K75rt
1991 K75s
LURKER at LARGE |
|
| Back to top |
|
 |
rydor Flying Brick Rider
Joined: 16 Nov 2006 Posts: 1304 Location: Southern Illinois, U.S.A.
|
Posted: Sat Jan 10, 2009 4:29 pm Post subject: |
|
|
| The driver probably got his CDL for $$$ in Illinois... |
|
| Back to top |
|
 |
Roy S. Flying Brick Rider

Joined: 05 Mar 2008 Posts: 1349 Location: W. Sacramento, California
|
Posted: Fri Jan 16, 2009 10:02 pm Post subject: |
|
|
He/She,
At the very least, they, had the binders set properly  _________________ 1993 K1100LT/On going project
1990 K75rt
1991 K75s
LURKER at LARGE |
|
| Back to top |
|
 |
|