K11 Owners Group Forum Index K11 Owners Group
K11 Owners Group
 
 FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

Driveshaft rebuild

 
Post new topic   Reply to topic    K11 Owners Group Forum Index -> Tech
View previous topic :: View next topic  
Author Message
dave n
Flying Brick Rider


Joined: 13 Dec 2003
Posts: 316
Location: Gastonia NC

PostPosted: Fri Nov 25, 2011 9:30 pm    Post subject: Driveshaft rebuild Reply with quote

Anyone recognize this type of driveshaft rebuild (who done it?)

Some very nice welding build up was done on every bearing cup surface.

With all this welding; boring holes to size and cutting retaining ring

grooves I would imagine this rebuild fairly costly. Not sure how it would

compare to cost of new piece.

No idea of miles on this unit - all bearings are tight. I do wish it had grease fittings installed.


_________________
Dave Norris KOG 248
1999 Cagiva Gran Canyon
1993 K1100LT w/Hannigan sidecar
2008 Suzuki DR650
Back to top
View user's profile Send private message Send e-mail
Ernie-NH
Flying Brick Rider


Joined: 14 Oct 2009
Posts: 982
Location: Bristol, New Hampshire

PostPosted: Sat Nov 26, 2011 9:07 am    Post subject: Reply with quote

Very Happy Very Happy Very Happy Very Happy

Good morning Dave...

I understand that "Hendersen Precision Mfg" does exactly this type of rebuild. You could call/email them to see the details...

<<< http://www.hendersenprecision.com/ >>>

Good luck.......// Ernie in NH
_________________
AMA,, American Deaf Bikers
Airhead Beemers Club
'11 G650gs
'95 K1100LT
'76 R100/7
Back to top
View user's profile Send private message Send e-mail
Ernie-NH
Flying Brick Rider


Joined: 14 Oct 2009
Posts: 982
Location: Bristol, New Hampshire

PostPosted: Sat Nov 26, 2011 9:23 am    Post subject: Reply with quote

Very Happy Very Happy Very Happy Very Happy

Good morning Dave...

I understand that "Hendersen Precision Mfg" does exactly this type of rebuild. You could call/email them to see the details...

<<< http://www.hendersenprecision.com/ >>>

Good luck.......// Ernie in NH
_________________
AMA,, American Deaf Bikers
Airhead Beemers Club
'11 G650gs
'95 K1100LT
'76 R100/7
Back to top
View user's profile Send private message Send e-mail
SugarHillCTD
Site Admin


Joined: 10 Oct 2007
Posts: 4238
Location: Now in Eastern Pennsylvania

PostPosted: Sat Nov 26, 2011 10:14 am    Post subject: Reply with quote

Dave,

Rusty @ MaxBMW (THE parts guy) recommended Bruno for driveshaft repairs.

http://www.brunos.us/

Don't know who did the repairs on yours

but in the next few weeks I have to send my driveshaft to him.
_________________
John & Cathy

'92 K100RS4V Pearl White SOLD
'04 K1200GT
IBA Several-SS1k, BBG, 50CC NYC to S.F.
Back to top
View user's profile Send private message Send e-mail
Phil Marvin
Rider in the Sky


Joined: 03 Apr 2003
Posts: 1389
Location: El Paso, Texas, USA

PostPosted: Sat Nov 26, 2011 1:49 pm    Post subject: Reply with quote

Hi, John,
If you also send the final drive , he will also rebuild the splines and make them a bit longer than stock. His rebuilds, I believe, are better than new stock parts.
_________________
Ride Safe,
Phil Marvin in El Paso, TX
'94 K75A/3
'95 K75RTP
Back to top
View user's profile Send private message Send e-mail
SugarHillCTD
Site Admin


Joined: 10 Oct 2007
Posts: 4238
Location: Now in Eastern Pennsylvania

PostPosted: Sat Nov 26, 2011 4:51 pm    Post subject: Reply with quote

Thanks Phil,

I am going to start pulling the bike apart this week since it looks like winter is here (had to use the tractor/snowblower twice already)

Will look over the drivetrain parts for what needs to be R&R.

John
_________________
John & Cathy

'92 K100RS4V Pearl White SOLD
'04 K1200GT
IBA Several-SS1k, BBG, 50CC NYC to S.F.
Back to top
View user's profile Send private message Send e-mail
tibbe
Flying Brick Rider


Joined: 14 Jul 2003
Posts: 190
Location: Lulea Sweden

PostPosted: Wed Dec 07, 2011 6:37 am    Post subject: Reply with quote

Could aligning the direction / angle of the crossing in both end of the driveshaft influence lifetime ?
Back to top
View user's profile Send private message
Stoked Steve
Flying Brick Rider


Joined: 01 Sep 2004
Posts: 1402
Location: Virginia Beach, VA

PostPosted: Wed Dec 07, 2011 10:18 pm    Post subject: Reply with quote

Phasing?

I had a drive shaft U-joint blow out on me at about 53k miles (while at HM3). I had a spline lube job done by a dealer when I bought the bike at 41k miles. I suspect maybe they didn't phase the joints (due to some other sloppy work) when re-installing , but I sure did when I installed a used replacement one.

So far, so good...
_________________
Steve
Virginia Beach, VA
93 K1100RS Mystic Red SOLD
12 Suzuki DL650A VStrom
Back to top
View user's profile Send private message
TMCKRS4V
Big Brick Rider


Joined: 02 Dec 2008
Posts: 58
Location: NorCal

PostPosted: Thu Dec 15, 2011 1:04 am    Post subject: K Drive.. Reply with quote

Wish it had the zerk fittings like a Honda,,,
_________________
Tom Connolly

91 K100RS4V

Novato, CA

MOA / BMW NorCal / AMA


Last edited by TMCKRS4V on Thu Dec 15, 2011 1:08 am; edited 2 times in total
Back to top
View user's profile Send private message Send e-mail Visit poster's website
TMCKRS4V
Big Brick Rider


Joined: 02 Dec 2008
Posts: 58
Location: NorCal

PostPosted: Thu Dec 15, 2011 1:05 am    Post subject: K Drive.. Reply with quote

My front U joint failed @ 92K. (trans + Drive shaft R&R).
I am told that is about Par for these bikes. My local indy wrench keeps a D/S on the shelf for the K1200RS bikes. or I would get one of those.
If my '91 K100RS just
had a 6 speed ..I would be a bit happier...but I have managed to log 65,000 on it.
_________________
Tom Connolly

91 K100RS4V

Novato, CA

MOA / BMW NorCal / AMA
Back to top
View user's profile Send private message Send e-mail Visit poster's website
SugarHillCTD
Site Admin


Joined: 10 Oct 2007
Posts: 4238
Location: Now in Eastern Pennsylvania

PostPosted: Sun Feb 12, 2012 3:34 pm    Post subject: Reply with quote

Well with this non-winter (NO snow but still pretty cold- 0°F here today) I set about pulling the driveshaft.

Last summer I had pulled it and detected very slight looseness in the front U-joint. Figured I could get through the rest of the riding season as is. It turned out to last until now.

Today I spent the morning in the garage (warm, well lit and bike on a lift makes it a much easier job) pulling the rear end apart. What did I find?

The front u-joint now has more play/slop.

One of the swingarm/FD pivot roller bearings is missing a few rollers! The missing rollers were down in the rubber boot along with some gear oil which means that.....

The pinion shaft seal into the FD is leaking.

NUTS!

So, driveshaft needs to go to Bruno for new joints.

Tom Cutter has plain bearings to replace the broken roller bearings- ordered them today.

and I might find out if MaxBMW will do the seal repairs when I carry the FD in, while I wait and wander around the showroom Shocked

Then it's on to new F & R suspension and we will be back on the road.

We are setting the K up as our dedicated 2-up ride- the R bike will be for solo fun.

John
_________________
John & Cathy

'92 K100RS4V Pearl White SOLD
'04 K1200GT
IBA Several-SS1k, BBG, 50CC NYC to S.F.
Back to top
View user's profile Send private message Send e-mail
SugarHillCTD
Site Admin


Joined: 10 Oct 2007
Posts: 4238
Location: Now in Eastern Pennsylvania

PostPosted: Thu Feb 16, 2012 8:26 am    Post subject: Reply with quote

OK folks, opinions please.........

Just found out that my driveshaft repair (just need 1 new universal joint, they do both) from Bruno will be about $500US Shocked They use new joints that have grease fittings.

Anyone else think this is a bit excessive?

Alternatives:

Tom Cutter referred me to Hendersen Precision http://www.hendersenprecision.com/index.html who will do the work on the one joint that is bad for about $190US

OR- find a used one- which seem to run in the $300 range but how long 'till that one needs R&R?

OR- buy new from England (Motobins or Motorworks) for about $500US plus shipping

Opinions? Other alternatives? Suggestions?

Thanks.
John
_________________
John & Cathy

'92 K100RS4V Pearl White SOLD
'04 K1200GT
IBA Several-SS1k, BBG, 50CC NYC to S.F.
Back to top
View user's profile Send private message Send e-mail
dave n
Flying Brick Rider


Joined: 13 Dec 2003
Posts: 316
Location: Gastonia NC

PostPosted: Thu Feb 16, 2012 12:55 pm    Post subject: Shafted ?? Reply with quote

Hmmm - looks like you are kinda backed into a corner to me.

My $.02 - 1) $300 is way too much for used

2) Makes no sense to only replace one end

3) So it's down to new or rebuilt for $500 - I'd go rebuilt. By the time shipping charges get applied - rebuilt will be lots less.

Please post a picture of the work if you get the remanufactured one.
_________________
Dave Norris KOG 248
1999 Cagiva Gran Canyon
1993 K1100LT w/Hannigan sidecar
2008 Suzuki DR650
Back to top
View user's profile Send private message Send e-mail
Jim
Site Admin


Joined: 17 May 2003
Posts: 3841
Location: WHERETHEFUNNEVERENDS

PostPosted: Thu Feb 16, 2012 1:43 pm    Post subject: Reply with quote

John - you only have to do this once. Think about all the money you're saving by doing the tear down yourself.

I would go with Bruno as a first choice.

Second pick would be to have Henderson replace both of them.
_________________
Jim
1997 K1100LTSE 94,000 - still has gremlins!
1995 R100RT Classic 16,650 crashed - repaired!
1992 K75RTP 46,000

"We shall not all die, but we shall all be changed."
Back to top
View user's profile Send private message Send e-mail Visit poster's website
garynali
Mad Brick Rider


Joined: 17 Apr 2010
Posts: 79
Location: Hervey Bay, Australia

PostPosted: Thu Feb 16, 2012 9:51 pm    Post subject: Reply with quote

Gday John
Did this work last year, brought the new item from motobins. Decision based on their price versus local purchase (AUD600 against $1200 local) and no one I knew of to do a local rebuild. Motobins unit is ok but no grease fittings. In your place i'd go Bruno every time. If I could have gotten greasable joints i'd have cut two access holes in the tube and made greasing a normal service item. Thats my two bobs worth.
Good luck
Gary C
93K1100RS
Back to top
View user's profile Send private message
SugarHillCTD
Site Admin


Joined: 10 Oct 2007
Posts: 4238
Location: Now in Eastern Pennsylvania

PostPosted: Fri Feb 17, 2012 6:19 am    Post subject: Reply with quote

Thanks folks- doing it right ONCE does make the most sense.

Especially when Bruno is going to send me back a driveshaft that is better than OEM.

Now to figure out the "how to ship it over the border without getting hit with some ridiculous customs fees", but I'll call them today to figure it out.

Thanks again. Very Happy
_________________
John & Cathy

'92 K100RS4V Pearl White SOLD
'04 K1200GT
IBA Several-SS1k, BBG, 50CC NYC to S.F.
Back to top
View user's profile Send private message Send e-mail
Jim
Site Admin


Joined: 17 May 2003
Posts: 3841
Location: WHERETHEFUNNEVERENDS

PostPosted: Fri Feb 17, 2012 11:08 am    Post subject: Reply with quote

John - I don't think you'll get hit with customs fees for service work.
_________________
Jim
1997 K1100LTSE 94,000 - still has gremlins!
1995 R100RT Classic 16,650 crashed - repaired!
1992 K75RTP 46,000

"We shall not all die, but we shall all be changed."
Back to top
View user's profile Send private message Send e-mail Visit poster's website
Display posts from previous:   
Post new topic   Reply to topic    K11 Owners Group Forum Index -> Tech All times are GMT - 4 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum


Powered by phpBB © 2001, 2005 phpBB Group